Low Profile Solutions






The Low Profile Solution (LPS) is a visually appealing, small-form-factor tower and equipment shelter that can be rolled out rapidly to provide increased wireless capacity between the traditional larger base stations.

The Low Profile Solution can support multiple networks and is suitable for deployment in underserviced rural areas.

This new solution comprises a pre-cast concrete plinth, a monopole with antenna heights ranging from 9m – 21m high, and a modular cabinet housing the power and RF equipment.

Outdoor equipment could additionally be installed directly onto the pole and be housed within the Radome to maintain the appeal of the site. Network back-haul connectivity is provided via fibre optic or microwave links.




The Camera Pole Solution (LPS) is a medium-form- factor tower that can be rolled out rapidly to provide increased wireless capacity between the traditional larger base stations. The CP can support up to 4 operator on 1 pole.

This solutions is currently rolled out in KZN where is it used to house or mount the municipal surveillances camera and Telco sites for operators like MTN, Vodacom, Cell-C and Telkom.

There are currently two variations of the CP:

  1. 24m
  2. 28m (Pole is in 2 sections)

Both pole solutions can be deployed in week from start to finish which makes them ideal for urban areas such as cites and towns.

Camera Pole Solutions Installations



Custom Solutions Installations






We also do custom solutions installations as per customer requests. The image on the left depicts a bespoke 5G installation for MTN done on a VumeCam Pole.

The solutions includes a 6m VumaCam Pole and an outdoor battery cabinet.

Solution was deployed in in 5 days.




Our inhouse RF and Civils team are capable of deploying RT installations on record time abased on designs / requirements supplied by the customer.

Roof Top site Installations



Bill Board site Installations






The deployment of a BB site include site specific I- beam designs to mount the antenna cluster. The installation of this solution takes 5 days to complete from site establishment to RF implementation.

Green Field (GF) Installations



Third Party New site builds (NSB)